PTS Provisional Results 2019 Pakistan Railways Headquarters Office Lahore (PR-HQOL) IV (275) for Sub Engineers All Positions Results Updated by Pakistan Testing Service
PTS Results 2019 PAKISTAN RAILWAYS Phase-V (PR-HQOL) (277)
S.No | Name | Action |
---|---|---|
1 |
Work Mistry Provisional Result |
Download / View |
2 |
C Class Trade Apprentices Provisional Result |
Download / View |
3 |
Lady Reservation Clerk Provisional Result |
Download / View |
4 |
02. SM Group Student Provisional Result |
Download / View |
5 |
01. Guard Gr-I Provisional Result |
Download / View |
6 |
09. Signal Maintainer Diesel |
Download / View |
7 |
Signal Maintainer Provisional Result |
Download / View |
8 |
03. Assistant Driver |
Download / View |
9 |
11. Technician Telecom Power Supply |
Download / View |
10 |
12. Technician Telecom |
Download / View |
===============================
PTS Provisional Results 2019 PAKISTAN RAILWAYS Headquarters Office Lahore (PR-HQOL) IV (275)
S.No | Name | Action |
---|---|---|
1 |
32. Sub-Engineer Boiler Maker (Mechanical) Provisional Result |
Download / View |
2 |
30. Sub-Engineer Re-Roller (Mechanical) Provisional Result |
Download / View |
3 |
29. Sub-Engineer Tool Maker (Mechanical) Provisional Result |
Download / View |
4 |
28. Sub-Engineer Fitter & Elector (Mechanical) Provisional Result |
Download / View |
5 |
27. Sub-Engineer Mechanical Diesel (Mechanical) Provisional Result |
Download / View |
6 |
26. Sub-Engineer Production Fitter & Elector (Mechanical) Provisional Result |
Download / View |
7 |
25. Sub-Engineer Black smith (Mechanical) Provisional Result |
Download / View |
8 |
24. Sub-Engineer Production Machinist (Mechanical) Provisional Result |
Download / View |
9 |
21. Sub-Engineer Coach Builder (Mechanical) Provisional Result |
Download / View |
10 |
23. Sub-Engineer Machinist (Mechanical) Provisional Result |
Download / View |
11 |
20. Sub-Engineer Millwright (Mechanical) Provisional Result |
Download / View |
12 |
22. Sub-Engineer Moulder (Mechanical) Provisional Result |
Download / View |
13 |
19. Sub-Engineer C&W Fitter (Mechanical) Provisional Result |
Download / View |
14 |
18. Sub-Engineer Drawing CFI (Mechanical) Provisional Result |
Download / View |
15 |
16. Sub-Engineer Carriage & Wagon (Mechanical) Provisional Result |
Download / View |
16 |
11. Sub-Engineer Welding (Civil) Provisional Result |
Download / View |
17 |
17. Sub-Engineer Electrical (Diesel) (Mechanical) Provisional Result |
Download / View |
18 |
15. Sub-Engineer Signal (Electrical) Provisional Result |
Download / View |
19 |
12. Sub-Engineer Electrical Power (Electrical) Provisional Result |
Download / View |
20 |
09. Sub-Engineer Maintenance-Electrical (Civil) Provisional Result |
Download / View |
21 |
08. Sub-Engineer D.O Bridge HQ (Civil) Provisional Result |
Download / View |
22 |
07. Sub-Engineer Water Supply (Civil) Provisional Result |
Download / View |
23 |
05. Sub-Engineer Drawing D.O. EHQ (Civil) Provisional Result |
Download / View |
24 |
04. Sub-Engineer Bridges (Civil) Provisional Result |
Download / View |
25 |
03. Sub-Engineer Works (Civil) Provisional Result |
Download / View |
26 |
02. Sub-Engineer Drawing Division (Civil) Provisional Result |
Download / View |
27 |
01. Sub-Engineer Way (Civil) Provisional Result |
Download / View |
28 |
10. Sub-Engineer Maintenance-Mechanical (Civil) Provisional Result |
Download / View |
29 |
26. Sub-Engineer Production Fitter & Elector (Mechanical) Provisional Result |
Download / View |
PTS Provisional Results 2019 Pakistan Railways Headquarters Office Lahore (PR-HQOL) IV (275) for Sub Engineers All Positions Results Updated by Pakistan Testing Service